top of page

Alabama Power - Coal Ash & RSA: Alabama’s Environmental Bomb

  • Jul 12
  • 1 min read

July, 2026

By David G. Bronner


The July 2026 issue of The Advisor, a Retirement Systems of Alabama publication, shares an important update from CEO Dr. David Bronner on the coal ash problem at Plat Barry.


"Correcting the Barry site time bomb will cost about $4 billion, and waiting

means higher costs and unnecessary risks to Alabama’s future. Alabama Power is not a bad actor that intentionally or negligently pollutes. They followed the rules; the rules changed; therefore, the state and

federal governments should fund their share of correcting this critical problem for all of Alabama. The Barry Ash Pond is not only an Alabama Power issue but also a statewide problem that must be corrected before a breach occurs in Mobile."



faded-small.png

Coal Ash Action Group is a collective of concerned citizens from coastal Alabama and beyond working to raise awareness of the toxic hazard posed by the coal ash pit at Alabama Power's Barry Steam Plant located next to the Mobile River.

ADDRESS

P.O. Box 699
Montrose, AL 36559

  • Facebook
  • Instagram

© 2026 Coal Ash Action Group. 

bottom of page